1 MW of a total of five facilities
- Basic grounding system
- Equipotential system equipment
- Surge Arrester System
AC-DC and Data Line LV arresters are used. Taking place in our country in 2014 with the title of largest solar power plant project. For a minimum of 20 years it is of great importance to the survival of plant systems integration. In locations exposed to the constant lightning strikes as Burdur achieved the highest level of system solution.